I’m so honoured to have my work exhibited on the online event hosted by @unescobangkok on the theme #TogetherForPeace 🕊💗
https://bangkok.unesco.org/content/together-peace-silent-manga-exhibition-and-special-event
🌟The online repository of this exhibition displays 15 of 274 entries submitted by artists from 117 countries in the SILENT MANGA AUDITION® (SMA) Round 13, under the theme Together for Peace. The contest was organized by Tokyo-based Coamix with UNESCO Asia and Pacific Regional Bureau for Education.
https://bangkok.unesco.org/content/together-peace-silent-manga-exhibition
🌟On Friday 14 May, a special event will be organized online via Zoom. This will start with a screening of ‘SKY SKY’, a short film directed by the Thai director Nonzee Nimibutr. It is part of ‘Angel Sign’ – a dialogue-free film of interconnected stories based on five silent manga.
🌟The event will also include a panel discussion ‘Manga for a Cause’ which will feature cartoonist Sa-ard, manga storyboard writer Aruntiwa, and visual communications design lecturer Chanisa Changadvech from Silpakorn University, moderated by web-comic artist Vicmon. Lucky participants will have a chance to win prizes including Silent Manga Catalogues.
___
Date and time: Friday 14 May 2021 from 3 pm to 5.20 pm
Format: Online via Zoom
To register: http://bit.ly/SMA0514ZoomR
Note: Due to the ongoing COVID-19 situation, a physical SMA exhibition will be organized at the Bangkok Art and Culture Centre (BACC) later this year (TBA). This first SMA exhibition in Asia outside Japan will be organized by UNESCO, with The Japan Foundation, Bangkok, and BACC. The art and manga school KP Learning Space will conduct live illustration sessions on weekends.
#silentmangaaudition #unesco #thailand
同時也有5部Youtube影片,追蹤數超過23萬的網紅Coco哥,也在其Youtube影片中提到,撳我呢條Link下載Landlord Go即時送你100萬金幣! 仲可以享有一折課金買coin pack嘅優惠! http://bit.ly/CocoHK 開game頭七日Empire value最高嗰位觀眾,仲可以額外得到$100 giftcard! 記得喺Facebook、Instagram t...
「to be submitted later」的推薦目錄:
- 關於to be submitted later 在 Facebook 的精選貼文
- 關於to be submitted later 在 Milton Goh Blog and Sermon Notes Facebook 的精選貼文
- 關於to be submitted later 在 許文昌 Man-cheong Facebook 的精選貼文
- 關於to be submitted later 在 Coco哥 Youtube 的最讚貼文
- 關於to be submitted later 在 Mars Hartdegen Youtube 的精選貼文
- 關於to be submitted later 在 Mars Hartdegen Youtube 的最佳貼文
to be submitted later 在 Milton Goh Blog and Sermon Notes Facebook 的精選貼文
Adam, the first man, broke God’s command by eating from the tree that he was told not to eat from. Adam was originally appointed as the ruler of the earth, so when he sinned, his entire kingdom (the whole earth and its inhabitants) fell with him.
The devil came in the form of a serpent and tricked Adam’s wife Eve into eat from the tree, and Adam ate after being offered the fruit by Eve.
By heeding the devil’s temptation, the rulership of the earth was handed to him (Satan), and death came into the world because of Adam’s sin.
Ever since then, every man and woman was born with sin that is inherited from Adam, passed down via the genes. Man was in a desperate condition, cut off from God because of sin.
God loves mankind and doesn’t want man to perish in their sins.
Thankfully, the Son of God willingly chose to lay aside His divine glory and submitted to God the Father’s will.
He was born of a virgin, as a Man and named “Jesus”.
He grew up in obscurity, and at the age of thirty, began a public ministry of miracle healing, casting out demons, opening the eyes of the blind and making the deaf hear. He went about doing good in the power of the Holy Spirit, proving that He was God’s anointed one (the Christ).
After three and a half years later, Jesus was falsely accused of blasphemy and whipped until He was bleeding profusely from His body. He was subsequently sentenced to death by crucifixion, and had to carry a heavy cross to a place called Golgotha on Mount Moriah, and He was crucified there.
God the Father placed all the sins of the world throughout time upon Jesus, and unleashed the fire of God’s wrath as a punishment for all those sins He carried. Jesus was punished as if He were the worst sinner in existence.
For three hours starting from noon, darkness came upon the whole land, reflecting what was going on in the spiritual realm. Jesus hung there, being drained of His precious lifeblood for our sakes, and He endured every trace of punishment for our sins.
When every sin had been punished, Jesus cried out, “It is finished!” He gave up His spirit after completing His mission of being the perfect atoning sacrifice for our sins, and entrusted Himself into the Father’s hands.
Jesus’ body was buried in the tomb of a rich man, and the tomb was then heavily guarded by Roman soldiers and even sealed by the huge stone. This was to ensure that no one would steal Jesus’ body and claim that He had resurrected.
On the third day after His death, Jesus rose from the dead early at the break of dawn, and walked out of the tomb, phasing through the huge stone. He proved that He was a perfect, unblemished sacrifice, and death had no claim over Him (death can only fasten on a sinner because the wages of sin is death).
He appeared to His disciples and many others—multiple hundreds of people, before ascending to Heaven forty days later, and He sat down at the right hand of the Father, far above all principalities and powers.
Jesus was bestowed with the name that is above every name because He who is the King of all creation humbled Himself so low, even to the death of the cross, restoring what He did not lose.
This same Jesus who lives by an everlasting life and who will never die again, invites you to freely receive the gift of salvation from Him if you haven’t done so.
As the only begotten Son of God, the blood that Jesus shed for you is an overpayment for your sin debt which you owe God.
Just by believing and confessing Jesus as your personal Lord and Savior, all your record of sins will be wiped clean by His precious blood, and you will be adopted as a royal priest in God’s family.
This forgiveness of sins comes through an everlasting agreement God has made through Jesus, called the “New Covenant of Grace”.
When you agree to be under Grace, you will become God’s beloved child, favored, blessed with every blessing, and an heir with an inheritance to receive and enjoy now, and in the eternal ages to come.
If you are ready to receive Jesus as your Lord and Savior and enjoy true happiness with a quality of life called eternal life, just speak this prayer whenever you are ready:
“Dear Jesus Christ, I receive You as my Lord and Savior. I believe that You carried my sins as you hung on the cross and that you were punished by the Father for them. You were buried, and then you rose again on the third day as a proclamation that all my sins have been perfectly forgiven. I believe that I am now a child of God, forever saved, and greatly blessed because of Your precious blood that has cleansed me. Baptize me with Your Holy Spirit, clothe me with Your power from Heaven, and use my life for Your glory from now on. In Jesus’ precious name I pray, Amen!”
If you prayed that, congrats! You are now born-again into God’s family and you are saved. Can I recommend that you like and follow this page and read my daily posts to help you grow in knowledge of what has happened to you and the rich inheritance you have in Christ?
The following article is a good starting point for new believers like you. Read it: https://www.miltongoh.net/miltons-blog/gospel-truths-for-new-christians-a-beginners-guide-for-believers
If you are already a believer, sharing this post could be a way for you to share the Gospel of Grace with a friend or loved one of yours this Christmas. The gift of knowing Jesus as Lord is the best present you can give someone. Who is the Holy Spirit leading you to share this post with? Tag them in the comments, and send this post to them by private message. Let’s share God’s love and grace revealed in the person of Jesus Christ.
to be submitted later 在 許文昌 Man-cheong Facebook 的精選貼文
阿斯利康和牛津疫苗劑量調整下可能到九成,計埋成本好抵。
When the vaccine was given as a half dose, followed by a full one at least one month later, efficacy — a measure of how a vaccine prevents infection or severe disease in trials — was 90 per cent. When the jab was given as two full doses at least one month apart, efficacy was 62 per cent. The average efficacy was 70 per cent.
to be submitted later 在 Coco哥 Youtube 的最讚貼文
撳我呢條Link下載Landlord Go即時送你100萬金幣!
仲可以享有一折課金買coin pack嘅優惠!
http://bit.ly/CocoHK
開game頭七日Empire value最高嗰位觀眾,仲可以額外得到$100 giftcard!
記得喺Facebook、Instagram tag返我
仲有hashtag #LandlordGO 喇!
BNO VISA?? 申請失敗? 一個月後搞成點?
▶ 加入我們的patreon|https://www.patreon.com/cocogor
【如果喜歡這條影片,記得給我Like & 訂閲我的頻道 】
https://www.youtube.com/c/cocogor?sub_confirmation=1
?Instagram|https://www.instagram.com/officialcocogor/
?Facebook|https://www.facebook.com/officialcocogor/
?商務合作|officialcocogor@gmail.com
▄▄▄▄▄▄▄⭐️ 精選影片⭐️ ▄▄▄▄▄▄▄▄
?被動收入?累積財富??英國買樓退休?錢搵錢 話咁易❓
https://youtu.be/8KIrDTwMX1A
?保命必睇⚠️政府公然搶錢?銀紙快速貶值50%?
https://youtu.be/Q6d9bhJOu9U
?住英國?香港經典食物日日有?腸粉?魚旦?臘腸 中超重有乜嘢?
https://youtu.be/Ft4a2xTu-_s
?科興疫苗?你懂的?2021年必賺?復甦股?你一定要知道! biontech 掂曬
https://youtu.be/Hs_H5zJg4qs
Detail of the competition for the audience:
The Competition is organized by the Reality Games, run by Reality Games (London) Ltd, located at Office 212, 15 Ingestre Place, Soho, London W1F 0JH, Great Britain, tax ID: GB199678519, company number: 08983817. („Organizer").
The Organizer declares that the Competition is in no way sponsored, endorsed, managed, or associated with the entities managing or owning the Youtube.com social network through which the Competition can participate. These entities do not bear the news in time to listen to the Competition on the claims of course participants for the position of the regulations.
Employees of the Organizer and other entities directly involved in the preparation and conduct of the Competition at the request of the Organizer, as well as members of the immediate families of these persons, cannot participate in the Competition. By members of the immediate family, it is understood: ascendants, descendants, siblings, spouses, siblings, parents, relatives, and relatives of the second degree as well as persons in the relationship of adoption.
A person who entered the Competition in accordance with the provisions of these Regulations becomes a participant of the Competition (hereinafter: Participant).
The competition runs from 21st of March 2021 to 4th of March 2021 until 23:59. The competition will be adjudicated on 5th April 2021.
By entering the competition, you accept these Regulations.
1. The goal is to achieve the highest empire value possible in two weeks' time.
2. Every player must write a phrase “teamcoco” in their in-game name.
Ex. playername_teamcoco
3. The First rule is to download Landlord Go through the affiliate link. (Player will get 1M cash if they download the game through the link).
4. The minimum empire value is 10M. Below this level players won’t be taken into consideration.
5. The competition will last 2 weeks
6. Day after the competition ends is on the 5th of March 2021, we will select the winner with the highest empire value and check whether she/he has met the necessary condition, which is to obtain a minimum 10M empire value.
7. The influencers will announce the results of the competition in the IG story after 2 weeks after the release of the contest announcement video. It is on the 5th of March.
8. The competition is only for the players who register in the game from the 21st of March 2021
9. If two players at the end of the competition get the same highest empire value the winner is the person who gets that value in a shorter time.
10. The reward will be sent at the Organiser's expense to the address indicated by the Participant within 30 working days from the end of the competition.
11. Influencer will announce the results of the competition on the 5th of April on his Instagram.
11. The Organizer is not responsible for the inability to transfer the prize for reasons attributable to the Participant, and in particular in the case of: failure to provide address data, providing incorrect, outdated, or incomplete address data.
12. The reward for the winner will be getting USD100 cash.
13. The reward for second place will be getting a package of 6500 coins in Landlord GO which is worth 50 $ in real life.
14. All complaints regarding the manner of conducting the Competition should be submitted by the Participants to the Organizer in writing.
A written complaint should include the name and full address of the Participant, as well as a detailed description and the reason for the complaint. Complaints will be considered immediately, but not later than within 14 days from the date of their receipt by the Organiser.
to be submitted later 在 Mars Hartdegen Youtube 的精選貼文
?? Construction of the Da Lat–Thap Cham Railway began in 1908, a decade after it had first been proposed by Paul Doumer, then Governor General of French Indochina, and proceeded in stages. Due to the difficulty of the mountainous terrain west of Sông Pha—where the Ngoan Muc Pass rose into the Central Highlands—construction proceeded slowly, requiring several rack railway sections and tunnels to be built. The railway was 84 km (52 mi) long, and rose almost 1,400 metres (4,600 ft) along a winding route with three rack rail sections and five tunnels. The railway tracks finally reached Da Lat in 1932, 24 years after construction had begun. Another railway station existed at the time, operated by the SGAI, a company that had managed the operation of the railway until that time. The job of designing and constructing a new railway station to replace the old one was given to French architects Moncet and Reveron, who submitted a proposal designed by Reveron in 1932. The new station would follow the Art Deco style popular at the time, but would incorporate some characteristics of a Cao Nguyen communal house of Vietnam's Central Highlands, specifically with its high, steep roofs. Construction of the new station began in 1935, directly supervised by Moncet, and was completed three years later in 1938, becoming one of the first colonial-style buildings to be erected in the area.
A JNR Class C12 steam locomotive at Da Lat Railway Station
Throughout the Vietnam War, the Da Lat–Thap Cham line—as with the entire Vietnamese railway network—was a target of bombardments and sabotage. Relentlessly sabotaged and mined by the Viet Cong, the line gradually fell out of use, with regular operations coming to an end in 1968. Following the Fall of Saigon in April 1975, the railway was dismantled to provide materials for the repair of the main line. In the 1990s, however, a 7 km (4.3 mi) section of the line between Da Lat Railway Station and the nearby village of Trại Mát was restored and returned to active use as a tourist attraction.
A 2002 planning document listed the restoration of the entire Da Lat–Thap Cham railway as a priority for infrastructure development for Da Lat and Lâm Đồng Province, including the upgrading of Da Lat Railway Station to handle passenger and cargo transportation. The proposed renewal received the backing of provincial and local governments, and the national government indicated that private companies would also be allowed to participate in the reconstruction of the railway. The project would also include a connection to the North–South Railway at Thap Cham, allowing trains to circulate between Da Lat and the rest of the country for the first time since the Vietnam War. In December 2009, four rail cars restored to look like the rail cars used on the Da Lat–Thap Cham line in the 1930s were put into use on the Da Lat–Trai Mat tourist railroad, carrying signage reading "Dalat Plateau Rail Road".
to be submitted later 在 Mars Hartdegen Youtube 的最佳貼文
??
Construction of the Da Lat–Thap Cham Railway began in 1908, a decade after it had first been proposed by Paul Doumer, then Governor General of French Indochina, and proceeded in stages. Due to the difficulty of the mountainous terrain west of Sông Pha—where the Ngoan Muc Pass rose into the Central Highlands—construction proceeded slowly, requiring several rack railway sections and tunnels to be built. The railway was 84 km (52 mi) long, and rose almost 1,400 metres (4,600 ft) along a winding route with three rack rail sections and five tunnels. The railway tracks finally reached Da Lat in 1932, 24 years after construction had begun. Another railway station existed at the time, operated by the SGAI, a company that had managed the operation of the railway until that time. The job of designing and constructing a new railway station to replace the old one was given to French architects Moncet and Reveron, who submitted a proposal designed by Reveron in 1932. The new station would follow the Art Deco style popular at the time, but would incorporate some characteristics of a Cao Nguyen communal house of Vietnam's Central Highlands, specifically with its high, steep roofs. Construction of the new station began in 1935, directly supervised by Moncet, and was completed three years later in 1938, becoming one of the first colonial-style buildings to be erected in the area.
A JNR Class C12 steam locomotive at Da Lat Railway Station
Throughout the Vietnam War, the Da Lat–Thap Cham line—as with the entire Vietnamese railway network—was a target of bombardments and sabotage. Relentlessly sabotaged and mined by the Viet Cong, the line gradually fell out of use, with regular operations coming to an end in 1968. Following the Fall of Saigon in April 1975, the railway was dismantled to provide materials for the repair of the main line. In the 1990s, however, a 7 km (4.3 mi) section of the line between Da Lat Railway Station and the nearby village of Trại Mát was restored and returned to active use as a tourist attraction.
A 2002 planning document listed the restoration of the entire Da Lat–Thap Cham railway as a priority for infrastructure development for Da Lat and Lâm Đồng Province, including the upgrading of Da Lat Railway Station to handle passenger and cargo transportation. The proposed renewal received the backing of provincial and local governments, and the national government indicated that private companies would also be allowed to participate in the reconstruction of the railway. The project would also include a connection to the North–South Railway at Thap Cham, allowing trains to circulate between Da Lat and the rest of the country for the first time since the Vietnam War. In December 2009, four rail cars restored to look like the rail cars used on the Da Lat–Thap Cham line in the 1930s were put into use on the Da Lat–Trai Mat tourist railroad, carrying signage reading "Dalat Plateau Rail Road".